Bengals Paycor Stadium Wireless Infrastructure
United Electric
Location: Cincinnati, OH
Market Segment: Infrastructure
The Project: Paycor Wireless Infrastructure Project: The removal of about 700 old Wireless Access Points, Installation of 1425 new Wireless Access points and Installed 330,000 ft of Cat 6A cable. Project amount was 3.4 Million and employed 56 people for 7 months
Paycor House Conversion – IPTV: The removal of about 750 old TVs and installation of 1450 new TV displays throughout the
stadium. Installed 375,000 ft. of Cat 6A cable and added 450 new power receptacles and 3,360 strands of fiber. Go Bengals!