FEC Members Section

 
Leveraged Costs PDF Print E-mail

Typically the biggest cost on an electrical contracting project is labor. Your FEC team is always working with a familiar and skilled local labor force with which it has built positive relationships over the long term. Team members also realize that good safety and health programs provide benefits including saving money, improved productivity and efficiency, and bolster the organization's reputation where we do business. The result for you is maximum reliability, availability, work quality, and productivity—all at best-value rates. There are other areas of savings in addition to labor. FEC's nationwide joint-venture network also enables you the benefits of established local supplier relationships, and its group buying power makes volume discounts available on a national basis. Because the FEC network has member offices in every major metropolitan area, project travel costs are often substantially lower.